Historical Level
March 31, 2005, Jinggangshan Station was officially started with the opening of the Okayama Railway.
In December 2006, the main project of Jinggangshan Station was completed and entered into the internal and outer wall decoration stage.
On June 28, 2007, Jinggangshan Station was officially opened.
In February 2013, Jinggangshan Station fully implemented a real name verification of tickets.
In December 2019, a residential EMU train of 160 kilometers per hour at Jinggangshan Station.
Building size
Building Design
-
design concept
Jinggangshan Station Station is used to reflect the unique history of Jinggangshan, relying on a unique geographic background, integrating passionate revolutionary history, and a central symmetrical formation of station modeling. In the abstract form of Chinese traditional concept, it reflects the design intention, its shape is simple, but huge metal, a metaphor for traditional building roofs, integrating classical and modern art into integrates, creating rich artments.
-
Design parameters
As of June 2007, the construction area of Jinggangshan Station has a total of 9970 square meters. Rice, the square area is 35,000 square meters.
Overall layout
Jinggangshan station station main body is divided into three parts, the main body is the main train area, the main body west is the ticket office, the VIP area and the public security office, the main body Side is an outbound hall, a line of lading room and a station office and equipment work area.
Station line
As of June 2007, Jinggangshan Station station scales were 3 sets of 7 lines, and the routes were a gengjun railway.
Operation situation
self-help ticket
As of February 2017, Jinggangshan Station has 3 automatic ticketing machines.
Convenient facilities
During the Spring 2017 Spring Festival, Jinggangshan Station provides a mobile phone charging device for convenient passengers, and implements WiFi wireless network coverage, providing traffic information in the country to train, flights.
Passenger traffic flow
2005 to 2011, Jinggangshan Station launched by Jinggangshan Station has been safely transported by 5 million passengers.
Featured Services
-
"Red Traffic" broadcast program
Jinggangshan Station made "red past" broadcast show, launched "Today, Today", "People Spring and Autumn", "Jinggang Fengyun", telling a famous incident in history, introducing a Jinggangshan Revolution The historical figures, telling the historical events of a Jinggangshan revolutionary struggle, playing the waiting passengers every day.
-
"Yingshan Red" Service Small Team
Jinggangshan passenger workers have established "Yingshan Red" service The small detachment, using the rest time to unify the Red Military service, wear the party's emblem, carrying the red army package, serving the passenger. They are standing up to nail, paper pen, needlework, and some non-prescription drugs to solve some practical difficulties, take care of customers.
Transportation Transportation
As of December 2019, Ji'an Bus 98 Road Jinggangshan Station, the uplink is started by Jinggangshan Station, and the first Tashi, the summer bus 5:50, Summer last bus 19:20; winter first bus 06:10, winter last bus 19:20. The downlink is returned by Tashi, the first bus is 6:30 in summer, the summer bus 18:20; winter first bus 06:30, winter last car 17:50; shift interval: 15-25 minutes.
Value meaning
Jinggangshan Station is an important service window of the Chinese revolution - Jinggangshan. (People's Network Commentary)
-